KM International
Asphalt Hot Box Reclaimers
KM 4000/ KM 8000
The KM 4000 2-ton Hotbox is designed to slide into any pick-up truck. The KM 8000 4-ton Hotbox is designed to fit on the back of a flat bed truck or trailer.
Thermostatically controlled heat allows minimum propane consumption while keeping asphalt at working temperature for up to 3 days.
- Reclaim asphalt within 8 to 10 hours, material is ready for use
- Asphalt repairs can be made year-round
- All units available Propane or Diesel
When new asphalt is unavailable, stock-piled or used material can be loaded for reclaiming. Have hot mix year-round.
- Teamed with the KM Infrared and Asphalt Recyclers, KM Hotbox Reclaimers offer permanent asphalt repairs year-round.
- Extend the working seasons with KM repair equipment.
- The KM 4000 and KM 8000 allow work when plants are closed and are the perfect match to the Asphalt Recycler.
- No longer do you need to discard old asphalt.
Teamed with a KM Asphalt Recycler, just stockpile and recycle it with a KM Asphalt Hotbox Reclaimer.